Apply for electricity connection  (2) expand_more expand_less
Pay the connection fee  (1) expand_more expand_less
flag

3
Pay in a bank
(last modified: 25/02/2020)

Costs

( in detail )

Time frame ( in detail )

Waiting time until next step

AMD 271000
10 mn  -  30 mn
10 days  -  15 days

Contact details

Entity in charge

Any bank operating in Armenia

Expected results

Payment receipt from bank

Requirements

1. 01 - Libre deuda de patente
Account number of "Electric Networks of Armenia" CJSC
(number is indicated in the contract)

Cost AMD 65,000

AMD expand_more expand_less
  • AMD Add Name Here
Standard connection fees
AMD 65,000
Single-phase 0.22kV - 10 kVA - Area of Yerevan
or  AMD 91,000
Single-phase 0.22kV - 14 kVA - Area of Yerevan
or  AMD 53,000
Single-phase 0.22kV - 10 kVA - Area of the Republic of Armenia
or  AMD 62,000
Single-phase 0.22kV - 14 kVA - Area of the Republic of Armenia
For connection of detached houses and commercial consumers with a voltage of 0,4 kV (three-phase network) standard connection fees (Fst.) (VAT included) are calculated with the following formula:

Fst. = Ffix. + Fvar. x Rpower x CII

Where:

Ffix. represents the fixed costs assuming they are equal to 203.000 (two hundred three thousand) AMD,

Fvar. represents the variable costs assuming they are equal to 7.500 (seven thousand five hundred) AMD per kVA;

Rpower represents the power (kVA) requested by the Applicant;

CII represents the cost intensity index assuming that it is 1.4 for the administrative area of Yerevan and 1 for other areas of the Republic of Armenia.

Commercial consumers with a voltage of 0,6 kV standard connection fees (Fst.) (VAT included) are calculated with the following formula:

Fst. = Ffix. + Fvar. x Rpower x CII

Where:

Ffix. represents the fixed costs assuming they are equal to 846,000 (eight hundred forty-six thousand) AMD,

Fvar. represents the variable costs assuming they are equal to 2150 (two thousand one hundred fifty) AMD per kVA;

Rpower represents the power (kVA) requested by the Applicant;

CII represents the cost intensity index assuming that it is 1.4 for the administrative area of Yerevan and 1 for other areas of the Republic of Armenia.

Time frame

Connection of the electricity in case of simplified connection of 0,22 kV voltage and 0.4 kV voltage takes. maximum 15 working days.

Timeframe for specific cases:

1) all other cases of connection of 0,22 kV voltage - maximum 50 working days;

2) all other cases of connection of 0.4 kV voltage connection - 55 days;

In case of connection of 6(10) kV voltage - maximum 90 days

in case of connection of a 35 kV, 110 kV voltage, or multi-storey buildings or districts- maximum 290 days.

Waiting time in queue: Min.   5mn - Max.  20mn
Attention at counter: Min.   5mn - Max.   10mn
Waiting time until next step: Min.   10 days - Max.   15 days

Legal justification

1. Public Services Regulatory Commission (PSRC) decision N659-N as of 21.12.2007 (ARM)
Public Services Regulatory Commission (PSRC) decision N659-N as of 21.12.2007 (ARM)
2. Public Services Regulatory Commission (PSRC) decision N358-N as of 17.12.2006 (ARM)
Public Services Regulatory Commission (PSRC) decision N358-N as of 17.12.2006 (ARM)

Additional information

After signing the contract, the applicant pays either the whole amount of the connection fee or makes 50% deposit paying the rest of the fee after completion of construction works by the utility provider.

Once the utility provider receives the payment, it starts carrying out construction works on the connection of a new consumption system to the electric grid within the time frame mentioned in the contract.