The best efforts have been made so that the data and material published in this site reflect actual administrative norms and practices.
Nevertheless, the entities mentioned in thesite are not responsible for its exactness and expressly deny any responsibility for the damages that would stem form use of the information from this site or use of the site itself. The site contains links to other web pages that are not the responsibility of the entities mentioned in the site.
By consulting this site, the user grants the most complete and irrevocable waiver to all entities mentioned in the site, freeing them absolutely from any kind of responsibility, and agrees to refrain from any action or claim.
Please copy/paste the following html code inside your page:
<iframe style="height: 100%; border:none; width: 100%;min-height: 400px;" src="https://armenia.eregulations.org/procedure/30/step/154?l=en&embed=true&includeSearch=true"></iframe>
Please copy/paste the following html code inside your page:
<iframe style="height: 100%; border:none; width: 100%;min-height: 400px;" src="https://armenia.eregulations.org/EmbedSearch?l=en&embed=true&includeSearch=true"></iframe>
Costs( in detail ) |
Time frame ( in detail ) |
Waiting time until next step |
||||
AMD
271000
|
|
|
Standard connection fees | |
AMD
65,000
Single-phase 0.22kV - 10 kVA - Area
of Yerevan
|
|
or
AMD
91,000
Single-phase 0.22kV - 14 kVA - Area
of Yerevan
|
|
or
AMD
53,000
Single-phase 0.22kV - 10 kVA - Area
of the Republic of Armenia
|
|
or
AMD
62,000
Single-phase 0.22kV - 14 kVA - Area of the Republic of Armenia
|
Timeframe for specific cases:
1) all other cases of connection of 0,22 kV voltage - maximum 50 working days;
2) all other cases of connection of 0.4 kV voltage connection - 55 days;
In case of connection of 6(10) kV voltage - maximum 90 days
in case of connection of a 35 kV, 110 kV voltage, or multi-storey buildings or districts- maximum 290 days.
Once the utility provider receives the payment, it starts carrying out construction works on the connection of a new consumption system to the electric grid within the time frame mentioned in the contract.
Fst. = Ffix. + Fvar. x Rpower x CII
Where:
Ffix. represents the fixed costs assuming they are equal to 203.000 (two hundred three thousand) AMD,
Fvar. represents the variable costs assuming they are equal to 7.500 (seven thousand five hundred) AMD per kVA;
Rpower represents the power (kVA) requested by the Applicant;
CII represents the cost intensity index assuming that it is 1.4 for the administrative area of Yerevan and 1 for other areas of the Republic of Armenia.
Commercial consumers with a voltage of 0,6 kV standard connection fees (Fst.) (VAT included) are calculated with the following formula:
Fst. = Ffix. + Fvar. x Rpower x CII
Where:
Ffix. represents the fixed costs assuming they are equal to 846,000 (eight hundred forty-six thousand) AMD,
Fvar. represents the variable costs assuming they are equal to 2150 (two thousand one hundred fifty) AMD per kVA;
Rpower represents the power (kVA) requested by the Applicant;
CII represents the cost intensity index assuming that it is 1.4 for the administrative area of Yerevan and 1 for other areas of the Republic of Armenia.